The reservoir's historic structures & ecosystems are an opportunity to create a unique environmental education center for our children & their future.

Friday, July 11, 2008

Jerome Park Reservoir Hearing

Just another reason not to trust the city's alleged plans for the Ridgewood Reservoir. The following was just published in the Daily News.

Hearing set on Jerome Park Reservoir blasting for water treatment plant
By Bill Egbert Daily News Staff Writer
Thursday, July 10th 2008, 5:10 PM

With residents going ballistic over the city's plan to use blasting for a water project in their area, three local community boards are joining for a public hearing to let them blow off steam.

Community Boards 7, 8 and 12 are sponsoring a public hearing July 15 to address the Department of Environmental Protection's recently announced plan to use blasting at the Jerome Park Reservoir in part of the controversial Croton Water Treatment Plant project underway at Van Cortlandt Park.

"There is a real fear that something major could go wrong," said Fernando Tirado, district manager for Community Board 7. "All the comments we're getting from the community so far have been negative."

Residents and community leaders are outraged at the dramatic departure from the plan assessed in the project's Environmental Impact Statement, which stipulated that the shaft by the reservoir would be dug by the raised-bore method - drilling up to the surface from the underground water tunnel - with the rubble removed through the tunnel to the Van Cortlandt site to be trucked away from there.

The new plan calls for four months of blasting down from the surface and trucking out the 9,000 cubic yards of debris through neighborhood streets.

DEP said it expects the blasting to be cheaper and faster than the method promised in the statement, but that's little comfort to local residents, said Tirado.

Citing overruns that have nearly tripled the cost of the multi-billion-dollar project, construction mishaps at the reservoir, and federal allegations of mob connections, Tirado questioned whether setting off explosives in a residential neighborhood next to three high schools and a college is the wisest way for DEP to start economizing.

"This seems to be a very cheap cost-cutting measure that doesn't take into account the interests of the community," Tirado said

Residents are invited to express their interests and concerns from 6:30 to 9:30 p.m. on Tuesday in the faculty dining room of the Lehman College Music Building.

DEP is also expected to give testimony justifying the departure from the statement and outlining noise mitigation measures it plans to put in place, such as enclosing the work area with a 20-foot-high sound barrier like the one surrounding the blasting work already carried out at Van Cortlandt Park.

wegbert@nydailynews.com

Send us an email

Another City Fighting Fake Turf

Residents of Highlands Park, San Carlos are also under assault by artificial turf planners. Check out their blog.

Thursday, July 10, 2008

Calvert Vaux Park meeting

This is another one of the mayor's "destination parks" that is destined for disaster if we don't make our voices heard.



Send us an email

Wednesday, July 9, 2008

Commissioner's Response to Turf Temperature

New York City's Department of Parks & Recreation Commissioner Adrian Benepe has come up with a creative solution to the unacceptably high temperatures associated with artificial turf - put up a sign. A story with the header "City posts warnings of health risks to those playing on scorching fields" just appeared in Metro NY. Is the next step going to be an instruction sheet for treating third degree burns on children?

Send us an email

Monday, July 7, 2008

More Artificial Turf Data

The following article is from the New York Daily News:

Parks' fake grass can reach a scorching 162 degrees
By Jeff Wilkins And Elizabeth Hays
Saturday, July 5th 2008, 10:00 PM

It's like walking on hot coals.

Artificial turf installed in city fields can heat up to a blistering 162 degrees even on a mild summer day, a Daily News investigation has found.

"My feet are burning! I had to dump cold water on my shoes just to walk around," Yannick Pena, 9, complained to his mom on a recent visit to Macombs Dam Park in the Bronx, where The News found the turf hit temperatures of 145 to 160 degrees on an 80-degree day.

At Staten Island's Greenbelt Recreation Center, where turf temperatures reached 149, park regular Diana Stentella, 58, wondered how kids survived the heat.

"When they play soccer here, do they have an ambulance to take the kids away?" Stentella said. "On a hot, humid day you would faint out here."

Over two mildly warm days last month, The News took surface temperature readings at five synthetic fields across the city accompanied by NYC Park Advocates, a group that has been critical of the fake grass.

At all five, temperatures at the synthetic fields soared roughly twice as high as at nearby natural grass ones, from a low of 144 degrees at the Greenbelt Recreation Center on Staten Island to a scorching 162 at Flushing Meadows-Corona Park in Queens.

"It's sadistic that the city is installing a product which gets so hot and is actually expecting the public to play on it," said NYC Park Advocates President Geoffrey Croft.

"Clearly, artificial turf presents many serious public health and safety issues that the city simply refuses to address," Croft said.

The scorching temperatures are just one of the nagging fears critics have about the turf, an infill made of recycled crumb rubber from old tires.

The city has installed the turf at nearly 100 parks and playgrounds across the city. An additional 68 projects are in the works.

Earlier this year, The News reported concerns that the millions of tiny crumbs contain heavy metals like lead and cadmium, as well as volatile organic compounds and other chemicals.

"This is very alarming," said Public Advocate Betsy Gotbaum when told of The News' findings. "Now this, on top of the other questions we have. There needs to be a moratorium on these fields."

Despite the uproar, a city Department of Health study concluded this spring that the chemicals in synthetic turf fields cause no known health problems.

Health officials acknowledged fake fields can get excessively hot and can cause more heat-related problems, especially in children.

When confronted with The News' findings, the Parks Department also conceded high temperatures can be a problem at turf fields.

They said they were in the process of installing signs warning visitors of the dangers at fields across the city.

"The temperatures can get very high during the heat of the day. But people are smart. They are not going to use a place that is uncomfortable to play on," said Liam Kavanagh, first deputy parks commissioner.

Kavanagh also said the city plans to stop using the crumb-rubber infill because of excessive heat and switch over to a carpet-style turf.

One of the fields The News tested, in Macombs Dam Park, already has the new turf - and still tested as high as 160 degrees.

"My feet always blister coming out here. The bottoms of my shoes feel like melted rubber, it gets so hot," said Luis Coronell, 33, who regularly takes his 10-year-old nephew, Andres, to play on turf field because there are no real ones in the neighborhood.

"You bring the kids out here, but you can't do anything because the turf gets too hot," Coronell said. "This turf is a killer."

ehays@nydailynews.com


Send us an email

NYC Parks Exposé

The New York Post has a two part exposé on the blatantly skewed maintenance in city parks:


"Comparing the manicured lawns of Manhattan's Central Park to the barren, rat-infested eyesore of Spring Creek Park in Brooklyn, the disparity is shocking."


Read the entire article here.

Tuesday, July 1, 2008

Queens Borough President Testimony

Below is the testimony given by Queens Borough President Helen M. Marshall at the NYC Council Committee on Parks and Recreation's Oversight Hearing - "Should Ridgewood Reservoir be Preserved as Wetlands".

Testimony of Queens Borough President Helen Marshall Before NY City Council Committee on Parks and Recreation – June 19Th, 2008

Good Morning members of The New York City Council, Parks and Recreation Committee Chair Foster, Commissioner Adrian Benepe from the Department of Parks and Recreation, and other distinguished guests. Before I begin, I would like to thank The City Council for holding this Oversight Hearing and affording us the opportunity to voice our concerns regarding The Ridgewood Reservoir and Highland Park.

Let me first begin by saying that I oppose the Department of Parks and Recreation’s plans to convert the historic landmark into ballfields. Rather, I am a strong advocate to preserve the unique and important ecosystems that have developed in Ridgewood Reservoir. Ridgewood Reservoir and Highland Park total approximately 142.5 acres of woodlands, lakes, wetlands, and picnic areas and is located on the Brooklyn/Queens Border within Highland Park. The Ridgewood Reservoir is an important area for resident, migratory and nesting birds and can serve as a place for environmental study, bird watching or simply just a place to enjoy the wonderful fruits that mother nature has to offer. In addition, the existing topography of Highland Park is not only permissable to scenic and serene walks, but if reconfigured and properly maintained, this area could serve for the site of many different sporting events, and help discount the need to build additional sports facilities. Unfortunately, Ridegwood Reservoir holds the distinction of being one of the eight “Underdeveloped Destination Parks” to be completed under Mayor Bloomberg’s Plan. To that end, I support and recommend the following:

(1) Creation of an ecology research center and museum which would be available to students in the surrounding areas


(2) Preserving all historic natural areas and ensuring that they receive the same treatment as historical landmarks


(3) Installation of security lighting, new fencing, rehabilitation of walkways and railing, and the creation of a security system to protect the reservoir from unauthorized entry; and


(4) Establishment of an ongoing maintenance program for existing sports facilities located on Jamaica Avenue in Lower Highland Park as well as the four baseball fields located in Upper Highland Park.


In closing, I know I have support from the community boards as well various civic and sports related groups and the Parks Services Committee when I ask that we work together with the Mayor’s Office, The City Council and the Department of Parks and Recreation to save the Ridgewood Reservoir and restore Highland Park. Through a jointly collaborative and cooperative effort, I feel we can maximize the full potential of this storied piece of land. Thank you once again for allowing me testify on this important issue.


Send us an email